The Ridge at the Bluffs Homeowners Association, Inc. ​Requirements for Metal Roof Contractors

Must be reviewed and signed for Application Approval

Date Received: _____________ Application #: ___________________ Approval Expires: ___________________

Lot Address:

Owner Phone:

Owner Mailing Address:

Contractor Company Name(s):

Contractor Address:

Contractor Phone:

Contractor Representative:

Owner Name: ​Owner Email:

Contractor Email:Cell #

Please read and check the below Architectural Standards Requirements:

 ​ ​ ​ ​ ​ ​ ​


Aluminum panels only, with a uniform width between 14 to 16 inches

Panel thickness must be a minimum of 0.032 inches

Panel will be factory finished containing 70% KYNAR 500® PVDF resin (or equivalent)

Panel style will be 1.5” standing seam

Panel shall be a striated type profile

Panel fasteners (screws, bolts, clips) will be stainless steel and must be concealed

Roof will have no exposed fasteners, including headwall flashings (Max 5” in height)

Existing Roof penetrations (e.g. exhaust vent caps, pipes, skylight trim) may be pre-finished in a closely ​matching color or painted to match roof panels

Drip edge, trim, caps, edges etc., shall be the same material and factory prefinished color as roof panels

Field applied coatings are prohibited except as described above, or for touch-up of minor cosmetic damage

Roof color shall be solid, with a gloss not to exceed 40 GU measured at 60 degrees from horizontal

Panel, drip edge, trim, caps, edges etc. colors may be:  White SandstoneMetallic Silver

Coatings of any type which alter the appearance of the roof are prohibited

Gutter color will be roof color or trim color/downspouts must match house color. Mill finish is not permitted

Panels must be stored on jobsite home address only (Not on neighboring lawns):

Panel storage must not block community sidewalks or must not extend into the street

Protection is required for neighbor’s yard - Contractor MUST cleanup daily

Old Roof must not be removed until all materials including panels are locally ready to deliver and install

Panel layout and offsets are aesthetically correct (as noted in ACC Metal Roof Standards)

Town of Jupiter permits are required

Other:

__

Contractor has 28 days (from start to finish) to complete installation. Contractor and Lot Owner

must comply with all Architectural Standards as they appear on

https://www.theridgeatthebluffs.com/documents. Penalties may apply for non-compliance.


Required Lot Owner Signature ____________________________________________ Date: ______________________

Required Contractor Signature ____________________________________________ Date: ______________________

Page 1 of 1

Rev. 02/15/22