The Ridge at the Bluffs Homeowners Association, Inc. Requirements for Metal Roof Contractors
Must be reviewed and signed for Application Approval
Date Received: _____________ Application #: ___________________ Approval Expires: ___________________
Lot Address:
Owner Phone:
Owner Mailing Address:
Contractor Company Name(s):
Contractor Address:
Contractor Phone:
Contractor Representative:
Owner Name: Owner Email:
Contractor Email: Cell #
Please read and check the below Architectural Standards Requirements:
Aluminum panels only, with a uniform width between 14 to 16 inches
Panel thickness must be a minimum of 0.032 inches
Panel will be factory finished containing 70% KYNAR 500® PVDF resin (or equivalent)
Panel style will be 1.5” standing seam
Panel shall be a striated type profile
Panel fasteners (screws, bolts, clips) will be stainless steel and must be concealed
Roof will have no exposed fasteners, including headwall flashings (Max 5” in height)
Existing Roof penetrations (e.g. exhaust vent caps, pipes, skylight trim) may be pre-finished in a closely matching color or painted to match roof panels
Drip edge, trim, caps, edges etc., shall be the same material and factory prefinished color as roof panels
Field applied coatings are prohibited except as described above, or for touch-up of minor cosmetic damage
Roof color shall be solid, with a gloss not to exceed 40 GU measured at 60 degrees from horizontal
Panel, drip edge, trim, caps, edges etc. colors may be: White Sandstone Metallic Silver
Coatings of any type which alter the appearance of the roof are prohibited
Gutter color will be roof color or trim color/downspouts must match house color. Mill finish is not permitted
Panels must be stored on jobsite home address only (Not on neighboring lawns):
Panel storage must not block community sidewalks or must not extend into the street
Protection is required for neighbor’s yard - Contractor MUST cleanup daily
Old Roof must not be removed until all materials including panels are locally ready to deliver and install
Panel layout and offsets are aesthetically correct (as noted in ACC Metal Roof Standards)
Town of Jupiter permits are required
Other:
__
Contractor has 28 days (from start to finish) to complete installation. Contractor and Lot Owner
must comply with all Architectural Standards as they appear on
https://www.theridgeatthebluffs.com/documents. Penalties may apply for non-compliance.
Required Lot Owner Signature ____________________________________________ Date: ______________________
Required Contractor Signature ____________________________________________ Date: ______________________
Page 1 of 1
Rev. 02/15/22